Schemes
Every registered scheme with its satellite observations: WaPOR water use and productivity, Sentinel-2 NDVI and ERA5 rainfall.
Schemes in register
32
0 with live WaPOR values
Mean water productivity
1.13kg/m³
Water consumed (season)
0million m³
AETI × irrigated area
Supply shortfall
0schemes
AETI / ET0 below 0.60
Register
FAO WaPOR v3 annual values per scheme · n/a where no measurement is stored · last update 2026-09-12
| Scheme | Basin | Command (ha) | Actual Evapotranspiration and Interception (AETI) (mm) | Reference Evapotranspiration (ET0) (mm) | Actual Evapotranspiration and Interception (AETI)/Reference Evapotranspiration (ET0) | Biomass (kg/ha) | Water Productivity (WP) (kg/m³) | Normalized Difference Vegetation Index (NDVI) (Oct–Apr) | Provenance | Actions |
|---|---|---|---|---|---|---|---|---|---|---|
| Kano River Irrigation Project (Phase I) NIIS-001 · KanoOperational | Hadejia–Jama'are | 22,000 | n/a | n/a | n/a | n/a | n/a | n/a | Not available No record · — | Read only |
| Hadejia Valley Irrigation Scheme NIIS-002 · JigawaPartially Operational | Hadejia–Jama'are | 12,500 | n/a | n/a | n/a | n/a | n/a | n/a | Not available No record · — | Read only |
| Bakolori Irrigation Project NIIS-003 · ZamfaraUnder Rehabilitation | Sokoto–Rima | 23,000 | n/a | n/a | n/a | n/a | n/a | n/a | Not available No record · — | Read only |
| Goronyo Irrigation Scheme NIIS-004 · SokotoOperational | Sokoto–Rima | 9,500 | n/a | n/a | n/a | n/a | n/a | n/a | Not available No record · — | Read only |
| South Chad Irrigation Project NIIS-005 · BornoNon-Operational | Chad Basin | 67,000 | n/a | n/a | n/a | n/a | n/a | n/a | Not available No record · — | Read only |
| Baga Polder Irrigation Scheme NIIS-006 · BornoPartially Operational | Chad Basin | 2,000 | n/a | n/a | n/a | n/a | n/a | n/a | Not available No record · — | Read only |
| Kiri–Dadin Kowa Command NIIS-007 · GombeOperational | Upper Benue | 8,000 | n/a | n/a | n/a | n/a | n/a | n/a | Not available No record · — | Read only |
| Savannah Sugar Numan Estate NIIS-008 · AdamawaOperational | Upper Benue | 14,000 | n/a | n/a | n/a | n/a | n/a | n/a | Not available No record · — | Read only |
| Middle Rima Valley Scheme NIIS-009 · SokotoPartially Operational | Sokoto–Rima | 5,000 | n/a | n/a | n/a | n/a | n/a | n/a | Not available No record · — | Read only |
| Kampe-Omi Irrigation NIIS-010 · KogiOperational | Lower Niger | 5,600 | n/a | n/a | n/a | n/a | n/a | n/a | Not available No record · — | Read only |
| Lower Anambra Irrigation Project NIIS-011 · AnambraPartially Operational | Anambra–Imo | 3,800 | n/a | n/a | n/a | n/a | n/a | n/a | Not available No record · — | Read only |
| Ogun–Osun Valley Scheme NIIS-012 · OgunPartially Operational | Ogun–Osun | 4,200 | n/a | n/a | n/a | n/a | n/a | n/a | Not available No record · — | Read only |
| Gari Irrigation Scheme NIIS-013 · KadunaOperational | Upper Niger | 3,100 | n/a | n/a | n/a | n/a | n/a | n/a | Not available No record · — | Read only |
| Wurno Irrigation Scheme NIIS-014 · SokotoOperational | Sokoto–Rima | 2,400 | n/a | n/a | n/a | n/a | n/a | n/a | Not available No record · — | Read only |
| Jibiya Irrigation Project NIIS-015 · KatsinaPartially Operational | Sokoto–Rima | 3,500 | n/a | n/a | n/a | n/a | n/a | n/a | Not available No record · — | Read only |
| Zobe Irrigation Scheme NIIS-016 · KatsinaUnder Rehabilitation | Sokoto–Rima | 3,000 | n/a | n/a | n/a | n/a | n/a | n/a | Not available No record · — | Read only |
| Doma Irrigation NIIS-017 · NasarawaPartially Operational | Lower Benue | 2,200 | n/a | n/a | n/a | n/a | n/a | n/a | Not available No record · — | Read only |
| Lower Usuma Command NIIS-018 · FCTOperational | Upper Niger | 1,800 | n/a | n/a | n/a | n/a | n/a | n/a | Not available No record · — | Read only |
| Duku Lade Irrigation NIIS-019 · KwaraPartially Operational | Lower Niger | 2,600 | n/a | n/a | n/a | n/a | n/a | n/a | Not available No record · — | Read only |
| Bacita Sugar Estate NIIS-020 · KwaraUnder Rehabilitation | Lower Niger | 10,000 | n/a | n/a | n/a | n/a | n/a | n/a | Not available No record · — | Read only |
| Ejule–Ojebe Rice Scheme NIIS-021 · BenueOperational | Lower Benue | 1,500 | n/a | n/a | n/a | n/a | n/a | n/a | Not available No record · — | Read only |
| Ebonyi Rice Cluster NIIS-022 · EbonyiOperational | Cross River | 2,800 | n/a | n/a | n/a | n/a | n/a | n/a | Not available No record · — | Read only |
| Itoikin Irrigation Scheme NIIS-023 · LagosNon-Operational | Ogun–Osun | 1,200 | n/a | n/a | n/a | n/a | n/a | n/a | Not available No record · — | Read only |
| Cross River Basin Rice Command NIIS-024 · Cross RiverPartially Operational | Cross River | 2,100 | n/a | n/a | n/a | n/a | n/a | n/a | Not available No record · — | Read only |
| Zauro Polder Project NIIS-025 · KebbiPlanned | Sokoto–Rima | 10,500 | n/a | n/a | n/a | n/a | n/a | n/a | Not available No record · — | Read only |
| Middle Ogun Irrigation Scheme NIIS-026 · OyoPartially Operational | Ogun–Osun | 3,200 | n/a | n/a | n/a | n/a | n/a | n/a | Not available No record · — | Read only |
| Galma Multipurpose Command NIIS-027 · KadunaUnder Rehabilitation | Upper Niger | 4,200 | n/a | n/a | n/a | n/a | n/a | n/a | Not available No record · — | Read only |
| Guzu–Guzu Groundwater Cluster NIIS-028 · YobeOperational | Chad Basin | 1,700 | n/a | n/a | n/a | n/a | n/a | n/a | Not available No record · — | Read only |
| JAWARIS JAWARIS · KanoUnknown | Hadejia–Jama'are | 3,650 | n/a | n/a | n/a | n/a | n/a | n/a | Not available No record · — | Read only |
| Kangimi Irrigation Scheme KANGIMI · KadunaUnknown | Kaduna | 1,404 | n/a | n/a | n/a | n/a | n/a | n/a | Not available No record · — | Read only |
| Kware Irrigation KWARE · SokotoUnknown | Sokoto–Rima | 424 | n/a | n/a | n/a | n/a | n/a | n/a | Not available No record · — | Read only |
| Alau (Borno) — 3 provisional project sites ALAU · BornoUnder Rehabilitation | Chad | 5,020 | n/a | n/a | n/a | n/a | n/a | n/a | Not available No record · — | Read only |
Field to data source mapping
Each register column, the dataset it comes from and the processing step that produces it.
| Register field | Unit | Dataset | Variable | Method | Step |
|---|---|---|---|---|---|
| Scheme identity, command area, status | ha | Scheme register (RBDA / federal ministry) | Gazetted command-area boundary | Government record; boundary used as the window for every satellite statistic | Acquire |
| Actual Evapotranspiration and Interception (AETI) (mm) | mm/year | FAO WaPOR v3 · L2-AETI-A | Actual evapotranspiration and interception | Mean of all valid pixels inside the scheme window | Derive |
| Reference Evapotranspiration (ET0) (mm) | mm/year | FAO WaPOR v3 · L1-RET-A | Reference evapotranspiration | Mean of all valid pixels inside the scheme window | Derive |
| Biomass (kg/ha) | kg/ha | FAO WaPOR v3 · L2-TBP-A | Total biomass production | Mean of all valid pixels inside the scheme window | Derive |
| Water Productivity (WP) (kg/m³) | kg/m³ | FAO WaPOR v3 · L2-GBWP-A | Gross biomass water productivity | Mean of all valid pixels inside the scheme window | Derive |
| Net Biomass Water Productivity (NBWP) (kg/m³) | kg/m³ | FAO WaPOR v3 · L2-NBWP-A | Net biomass water productivity | Mean of all valid pixels inside the scheme window | Derive |
| Growing-season Normalized Difference Vegetation Index (NDVI) | index (−1 to 1) | Sentinel-2 L2A (Copernicus / ESA, AWS open data) | Growing-season NDVI | Mean NDVI of cloud-screened scenes across the Oct–Apr growing season | Derive |
| Rainfall | mm/year | ERA5 (via the Open-Meteo archive) | Rainfall | Sum of daily precipitation at the scheme centre | Derive |
| Relative water supply (Actual Evapotranspiration and Interception (AETI) / Reference Evapotranspiration (ET0)) | ratio | FAO WaPOR v3 (L2-AETI-A ÷ L1-RET-A) | AETI ÷ ET0 | Seasonal ratio; below 0.6 flags a supply shortfall | Derive |
| Water consumed | m³ | FAO WaPOR v3 + scheme register | AETI × irrigated area | 1 mm over 1 ha = 10 m³ | Derive |
| Confidence and data quality | % | All of the above | Valid layers, pixel count, field agreement | Graded High / Medium / Low; low-confidence rows stay visible, never hidden | Grade |
How to read this register
Primary datasetFAO WaPOR v3 (L2, 100 m)
Temporal basisAnnual layers
Spatial unitWindow around the command area
Water volume1 mm over 1 ha = 10 m³
Shortfall thresholdAETI / ET0 below 0.60
Observation date2026-09-12
WaPOR pixels are coarse relative to a single command area, so these figures are dependable at scheme scale and should not be read plot by plot. Where a command-area boundary is outdated, every derived value for that scheme inherits the error.
Source portaldata.apps.fao.org/wapor
FAO WaPOR v3 data portalWaPOR v3 mapset catalogue (API this register reads)